
Our building team are relocating a steel container from one site to another. We disconnected the electrics, water and waste at its original location. Relocated the cabin via a local haulage company @lwbarkertransportservices. We have provided a new concrete base for the container to sit on along with new electrical connection, water supply and waste. All certified and to current regulations and apart from the haulage all carried out by our own staff.
At DCR we carry out many weird and wonderful jobs every week through our existing client base and new enquires.
We have 3 main departments, the building team, electrical team and mechanical team.
At the end of 2024 we expanded into our new offices at Fernwood business park allowing us to improve the way we run the business from the office side of things. We are able to quote all building, electrical and mechanical much quicker and easier with our new set up.
Our aim is the same on all work, give an exceptional level of customer service from initial phone call through to the delivery of the job including the highest standards possible in workmanship. It’s as simple as that and we work extremely hard everyday to try and maintain and improve everything we do.
For all enquires sales@dcr.co.uk
Komentāri