Boiler re-design and upgradeOld inefficient gas boiler out and new Viessmann 100 35kw compact installed. The heating system has been re-designed with new controls fitted for higher efficiency and reduced gas consumption.
Old inefficient gas boiler out and new Viessmann 100 35kw compact installed. The heating system has been re-designed with new controls fitted for higher efficiency and reduced gas consumption.
DCR Heating Design Evaluation Resulting in move from Oil to an Air Source Heat Pump for Nursery in Melton Mowbry
Comentarios