top of page
DCR-logo-small-blue.png

DCR Heating Design Evaluation Resulting in move from Oil to an Air Source Heat Pump for Nursery in Melton Mowbry


Client Request: New oil tank to obtain correct distances and service of 30 year old boiler.


Due to space around the building and the close proximity’s to boundaries for an oil tank along with the age of the existing oil boiler, DCR provided a design evaluation service against operating the nursery on oil.


The advantages of not needing oil storage, improved hot water, improved reliability and a reduction in running costs an air source heat pump was recommended. This did require new fan driven radiators to provide an improved SCOP and part system upgrade.


Comments


Phone: Newark 01636 706 068

London 02031 489 588 

Email: sales@dcr.co.uk

  • Facebook
  • Instagram

Head Office: DCR Electrical Ltd,

7 Halifax Court, Fernwood Business Park, Cross Lane, Fernwood, Newark, NG24 3JP

London Office:  Berkeley Suite, 35 Berkeley Square, Mayfair, London, W1J 5BF

bottom of page