A new hot water cylinder and replacement boiler in Southwell, Nottinghamshire, with a design able to heat the existing swimming pool and air handling system. Completed - DCR provided a high efficiency design using a Viessmann 200 boiler cascade providing reliability, efficiency and compatibility to the existing swimming pool equipment.
top of page
Head Office: DCR Electrical Ltd, Unit 16, Jessop Way, Newark, NG24 2ER
bottom of page
Comments